See the delay
This week, the 8 projects total 41 days past service level. The longest hold, 9 days, is the villas' concept design gate with the design consultant; the project's delay costs about AED 20,700 a day.
Demo · Real estate
An illustrative villa development stalls at a design gate until the Design Director decides. Then test moving one recurring check to an AI agent. This is the programme the interactive demo follows.
Respond to a stalled gate
A property developer runs 8 projects through approval gates, each with named roles and agreed service levels. One of them, a villa development valued at AED 142M, is at its concept design gate, which it passes only with a complete package from an outside design consultant.
Illustrative example. Fictional data. Days are calendar days, and today is a Wednesday. Amounts in AED, for illustration only.
This week, the 8 projects total 41 days past service level. The longest hold, 9 days, is the villas' concept design gate with the design consultant; the project's delay costs about AED 20,700 a day.
Portfolio 8 projects Delay this week: 41 days past service level
Villa development · concept design gate
Held by the design consultant, an outside party, for 9 days
Service level for this step: 5 days
Gate 9 days past its due date
Cost of delay AED 20,700 per day (AED 36.5M capital deployed × 7.5% + AED 142M project value × 3.39%) ÷ 365 project figure, counted once; the rates are assumptions
The consultant's hold: 9 days
Holding gates past their due date
Delay this week counts the days each open step spent past its service level, Monday to today.
An AI agent checks the consultant's package in 38 seconds and finds 3 issues, by rule and by reading the documents. It recommends a return; this check is shown in the demo.
Readiness check: concept design gate
Gate Readiness Agent · finished in 38 seconds 3 findings
Check and recommendation
Gate Readiness Agent AI agent
3 findings; recommends a return to the design consultant
The agent recommended a return; only an authorised person decides. Above AED 50M, as for this AED 142M project, the Design Director approves it, and the audit record keeps who, when and why.
Decision chain: concept design gate
Check and recommendation
Gate Readiness Agent AI agent
3 findings; recommends a return to the design consultant
Decision
Design Director Authorised person
Approved the return, with the reason recorded
Why the Design Director The project is valued at AED 142M. Above AED 50M, the Design Director decides.
Four kinds of action
Audit record: concept design gate
Entries, in order
Decision record
The consultant opens the return from an email link, with no login or licence, fixes the 3 items and resubmits the same afternoon. The clock stops on them; their page is shown in the demo.
Opened from an email link: no login, no licence
Villa development · concept design gate
Returned by the Design Director: 3 items to fix
Finding 1
Add the comment a "No" on planning alignment needs
Comment added
Finding 2
List the master plan modifications
Modifications listed
Finding 3
Declare the extra 80 units, or revise the layout
Declared on p. 22 of the revised report
Submitted today at 15:05 The clock stops on the consultant
Delay this week falls from 41 to 38 days, and reminders go out under agreed rules. In a pilot, each measure has an agreed baseline, target and forecast; actual results come only from real operation.
After the resubmission
What happens next, and who acts
Reminders go out automatically under the agreed rules; an escalation is sent only once a person confirms it.
Delay this week, 8 projects
Improve the operating model
A separate question: not how to respond to one stalled gate, but which checks recur on every project and who should do them. In the simulation, the baseline comes from 6 months of history across the 8 projects.
Illustrative example. Fictional data; the figures are simulated projections, not results.
Before each project's initiation business plan gate, a Commercial reviewer checks the cost plan by hand, line by line. It is a check, not a decision: the Segment CEO signs off the gate.
Where the work goes: the cost plan's first check
6 months of history, 8 projectsThe programme's recurring work, 100 points The first check: 10 points
Checking each cost plan before its initiation business plan gate, about 40 line items
A check, not a decision: the Segment CEO still signs off every initiation business plan gate.
In the simulation, a cost-plan agent runs the first check and the Commercial reviewer reviews what it flags, plus a sample. The Segment CEO keeps the sign-off, and nothing changes until they decide.
What-if: the cost plan's first check, every project
6 months of history, 8 projectsChange being tested
The cost plan's first check, before each initiation business plan gate
Now Commercial reviewer Person
Moves to Cost-plan agent in Commercial; the Commercial reviewer reviews what it flags AI agent
Stays with a person
Initiation business plan gate sign-off
Segment CEO Authorised person
Applies to every project. Nothing changes in operation until the Segment CEO decides on the evidence.
The projection states what it rests on: where each figure comes from, what a person still reviews, and what stays the same.
What-if: the cost plan's first check, every project
6 months of history, 8 projectsAssumptions behind the forecast
The projection shows the effect on the first check's days, the issues it finds and AI agents' share of the work. The cost: the reviewer's time on every flag and on the sample.
What-if: the cost plan's first check, every project
6 months of history, 8 projects| Measure | Baseline | Projected |
|---|---|---|
| First check, cost plan received to checked | 4.0 days | 1.5 days 2.5 days shorter |
| Issues found at the first check | 88% | 91% |
| AI agents' share of the programme's work | 18% | 28% |
| In return: the Commercial reviewer's review of flags and a sample | No baseline | 1.2 days |
After the next gates, we measure each result the same way as the baseline and compare it with the target and the forecast. Actual results come only from real operation, so this example shows none.
The tested change, every project
| Measure | Baseline | Target | Forecast | Actual |
|---|---|---|---|---|
| First check, days per cost plan | 4.0 | 3.0 | 1.5 | After the next gates |
| Issues found at the first check | 88% | 88% or more | 91% | After the next gates |
In a conversation, we show the interactive demo, which follows this programme, and map your departments and approval rules onto ZedNerve. A pilot then runs on one real process for about 12 weeks, in an environment agreed with you.